Complaints
Customer Complaints Summary
- 16 total complaints in the last 3 years.
- 5 complaints closed in the last 12 months.
If you've experienced an issue
Submit a ComplaintThe complaint text that is displayed might not represent all complaints filed with BBB. Some consumers may elect to not publish the details of their complaints, some complaints may not meet BBB's standards for publication, or BBB may display a portion of complaints when a high volume is received for a particular business.
Initial Complaint
Date:02/27/2025
Type:Service or Repair IssuesStatus:AnsweredMore info
Complaint statuses
- Resolved:
- The complainant verified the issue was resolved to their satisfaction.
- Unresolved:
- The business responded to the dispute but failed to make a good faith effort to resolve it.
- Answered:
- The business addressed the issues within the complaint, but the consumer either a) did not accept the response, OR b) did not notify BBB as to their satisfaction.
- Unanswered:
- The business failed to respond to the dispute.
- Unpursuable:
- BBB is unable to locate the business.
Hurricane ****** brought my huge Live Oak down and into my house causing significant roof and interior damage. After research I chose CMK Construction, Inc. to perform all the repairs. On Dec. 12, '24 I gave them (supposedly as a downpayment) $12,463 for interior repairs. However, the roof and roof frame needed major repairs before tha interior could start. The roof was completed in latter Jan., then *** kept delaying interior start all the while holding onto my $$. After some unpleasant exchanges, *** agreed to negate our contract and was to refund MOST of the $$. I still have not seen a *****. My repeated calls are being ignored. I have contacted the FL **************** have yet to hear back. I've called 8 On Your Side, nothing from them either. I think *** not returning my $$ is bordering on outright theft. I'm a 66 1?2 yr old single woman who has clearly been taken advantage of. Also, my homeowner's ins.. **** rejected ***'s quote citing the cost of their estimated repairs was double the industry standard. Also, the morning I got the rejection email from ****, *** sent a truck with approx. $700 of drywall and other materials, unloaded it into my garage before I could stop them and tell their boss that **** was not accepting their bid. No work AT ALL has been done by ***, only routine bids that are generally accepted as 'part of doing business'. There is much more and I have supporting documents to confirm what I just wrote. I thank you in advance for your assistance in this *********** regards **** *****Business Response
Date: 03/12/2025
Dear Ms. ************ want to clarify that we do not agree with the statements in your complaint, as they do not accurately reflect the facts of this situation. A partial refund check was issued to you on February 26, 2025, prior to your complaint, and our records confirm that it has been received and cashed.
Additionally, CMK Construction did not delay the start of your project. The delays were caused by your own decisions and actions, not by ***. We were fully prepared to begin work and even delivered materials to start the project. However, you ultimately delayed the process, and in the end, due to ongoing difficulties in working together, we agreed to part ways.
As the partial refund has been processed and completed, we consider this matter resolved. If you have any further questions or concerns, please feel free to reach out to us directly.Customer Answer
Date: 03/16/2025
Complaint: 22997403
I am rejecting this response because: I hired CMK Construction in good faith, that 'faith' was shattered. I'll explain.. I have never hired a General Contractor for any reason in the 39 years I've owned this house as a single woman. During the extremely stressful and chaotic aftermath of Hurricane ****** bringing my VERY huge Granddaddy Live Oak down and INTO my house and being completely alone I was in a state of panic to get repairs started right away. While 'dealing' with the huge mess, and the unknowns that were ahead I managed to research and 'interview' various GCs. The other GCs were backed up several weeks and CMK insinuated they could get on the job much sooner and required 1/3 ($12,461.82) down, of the full amount of $34,000, which I gave them on Dec. 12, 2024. However at that moment I had no roof. The roof was finally completed the end of January 2025. During that whole time CMK had my $12,461 that was INTENDED for INTERIOR repairs. Then I waited for interior repairs to start, and I waited and waited...Then on or about Feb, 5 **************************************************************** **** could not justify payment for the $34K CMK was charging for the interior repairs. Please see attached. On that same morning that I received that email from **** I had arrived home from the hotel I had been vacating to nightly due to the uninhabital conditions in my home to find two work trucks waiting. I 'assumed' they were to start work right then even though I'd had no notice from CMK! In addition, *** had previously told me they insisted on ANOTHER $12,461, 1/3 of the total, just to START the work. BUT, as they were unloading drywall and other materials into my garage, I had opened my email to find the rejection letter, re. the *** estimate I had sent them, from ****. I then literally scurried out to tell the guys who were unloading the materials to STOP!! And I was LITERALLY waving my arms to STOP! None of them spoke English and did not heed my instruction. That was the point when things really started going south with this whole debacle. In short, CMK had my $12,461 from 12/12/24 until Feb. 27 while doing NO work. See attach. re. a text telling *****, ('project mgr') to come pick up the 'dumped' off materials or I would consider them abandoned, I got no response. I consider the charge of materials, and delivery of, acceptable. BUT, I priced the materials myself.. approx. $700 worth and with delivery MAYBE $300 totaling maybe $1000. Also, they dumped off materials that were NOT necessary for the job and that remain in my garage. I believe CMK owes me $1500 (out of the $2500 they unjustifiably KEPT) for work NOT performed. There was NO labor, only the usually accepted time invested as the normal cost of doing business. Also, I was under the impression that all work was going to be performed by *** employees, not sub-contractors (i.e. Best Value Roofing) which I came to find out was not at all affiliated with ***, even though I was led to believe it was. But my complaint is not with Best Value Roofing, it is with CMK which has lost all credibility with me and I feel other people should be aware of their questionable tactics so they don't have to go through what I've gone through. Though this is a lengthy rebuttal, I found it necessary to go into more detail. I demand CMK to return no less than $1500, which is generous of me considering I'm stuck with unusable materials, the added stress of fighting this AND the over 60 days and nights I've had to go back and forth with my dog to a hotel room..
Sincerely,
**** *****Initial Complaint
Date:11/07/2024
Type:Service or Repair IssuesStatus:AnsweredMore info
Complaint statuses
- Resolved:
- The complainant verified the issue was resolved to their satisfaction.
- Unresolved:
- The business responded to the dispute but failed to make a good faith effort to resolve it.
- Answered:
- The business addressed the issues within the complaint, but the consumer either a) did not accept the response, OR b) did not notify BBB as to their satisfaction.
- Unanswered:
- The business failed to respond to the dispute.
- Unpursuable:
- BBB is unable to locate the business.
I hired *** for home renovations, about a third of project was installing ***** C131 solid hardwood throughout my home. They completed installation May 2024 and my warranty was good until May 2025. After hurricane ******, floors in front bedroom buckled. Teck *** sent to repair stated it was done incorrectly and they did not repair it. *** has to date not repaired flooring.*** sent email provided in attachment which includes specifications for an adhesive that was not used on my project. I requested at least three times via phone and/or email to speak with their upper management and they have not responded. When I called today, I felt PM yelled at me on the phone and was unprofessional. I have fallen on buckled floors and sprained my ankle. I had to get a corticosteroid shot and now have to wear a brace.I have had independent technician(s) give me estimate for repairing floor, who stated they could not repair it due to it being done incorrectly.After contacting manufacturers customer service below items were noted:-***** C131 is 3/4 solid hardwood. -CMK used ******* 1407 adhesive but it is not recommended for solid hardwood 3/4 (recommended for engineered hardwood no more than 1/2 or parquet) per manufacturers specifications.-A V notch trowel would be recommended for this installation, subcontractor used square notch trowel.Business Response
Date: 11/26/2024
We appreciate the opportunity to respond to the complaint regarding the flooring installation completed by CMK Construction in May 2024. We acknowledge the homeowner's concerns and would like to provide a detailed explanation of our position and the context surrounding this matter.
In May 2024, CMK Construction installed ***** C131 3/4 solid hardwood flooring in the homeowner's property. The installation was conducted under proper supervision, adhering to industry standards. For six months following the installation, the flooring was in stable condition, indicating that the materials and methods used during the installation initially performed as expected.
In October 2024, Hurricane ******, a historic and unprecedented weather event, impacted the region. The extreme moisture and environmental fluctuations caused by the hurricane introduced significant challenges. Additionally, a prolonged power outage in the aftermath of the storm prevented climate control systems from mitigating moisture buildup within the home.
This combination of elevated humidity and lack of air circulation likely resulted in moisture absorption by the wood, causing expansion and subsequent buckling. As a natural material, wood is particularly sensitive to environmental changes, and even properly installed flooring can be adversely affected under such extreme conditions.
These external environmental factors are beyond CMK Constructions control and fall outside the scope of standard warranties, which typically exclude damages resulting from natural disasters, flooding, or loss of climate control.
While ***** C131s manufacturer recommends mechanical fastening for 3/4" solid hardwood flooring, the product performed without issue for six months before the hurricane. This indicates that the materials and methods employed were not the primary cause of the flooring failure.
Both manufacturer and installation warranties typically exclude coverage for damage resulting from external events, including extreme weather and subsequent environmental factors. The excessive moisture and lack of climate control caused by Hurricane ****** and the associated power outage would void most flooring warranties, as the resulting damage is considered an environmental impact rather than an installation or material defect.
CMK Construction regrets the homeowner's experience and empathizes with the frustration caused by this situation. However, based on the following facts:
The flooring performed as expected for six months prior to the hurricane.
The extreme environmental conditions caused by Hurricane ****** and the associated power outage are the primary cause of the flooring issues.
These external factors void standard warranties and are beyond the installers or manufacturers control.
We are committed to assisting the homeowner in identifying potential steps for moisture mitigation and repair solutions. Should further clarification or information be required, we are available to provide additional details.Customer Answer
Date: 12/12/2024
Complaint: 22526665
I am rejecting this response because:
Sincerely,
***** *********Customer Answer
Date: 12/17/2024
Complaint: 22526665
I am rejecting this response because:CMK states that the damage to my floors occurred after six months. I did not have any flooding in my home and only lost power for a short time. It is normal for homes to occasionally lose power during a storm. It is not normal to have hardwood floors that buckle, for a company to not honor their warranty, or for other professionals to say that the prior job is irreparable.
My warranty was for one year, which they are refusing to honor even though the floors that they installed had major problems.Also, the concerns I raised in my initial complaint of them using ******* ******************************************* their response. I have had multiple professionals who I have had come out to give me estimates to repair the floor tell me that the job is irreparable.
To date no person from senior management at *** has responded to my request to contact me.
Sincerely,
***** *********Business Response
Date: 01/08/2025
Thank you for reaching out to us and sharing your concerns. We understand how frustrating and challenging this situation has been for you, and we deeply regret the difficulties you are experiencing with the flooring in your home.
As you mentioned, the flooring issues in your front bedroom occurred after Hurricane ******. We would like to address an important aspect of our warranty policy. Unfortunately, damages resulting from natural disasters, such as Hurricane ******, are not covered under the terms of the warranty provided for your flooring installation. This exclusion is standard in most warranty agreements, as natural disasters create conditions that are beyond the control of installation methods or materials used.Customer Answer
Date: 01/08/2025
Complaint: 22526665
I am rejecting this response because:The floor issues were not from ****** that the glue never adhered to the floor from using an improper trowel with an improper glue. The floor buckled from humidity not from water damage. And other spots of the floor have also never adhered to the floor due to improper trowel used with improper glue.
Also, the gaps in the floor were due to improper installation, not from any natural disaster.
CMK is at fault but using Hurricane ****** to try and get out of their responsibility.
Sincerely,
***** *********Initial Complaint
Date:09/05/2024
Type:Service or Repair IssuesStatus:AnsweredMore info
Complaint statuses
- Resolved:
- The complainant verified the issue was resolved to their satisfaction.
- Unresolved:
- The business responded to the dispute but failed to make a good faith effort to resolve it.
- Answered:
- The business addressed the issues within the complaint, but the consumer either a) did not accept the response, OR b) did not notify BBB as to their satisfaction.
- Unanswered:
- The business failed to respond to the dispute.
- Unpursuable:
- BBB is unable to locate the business.
we had vinyl flooring install with our remodel. Flooring is coming loose in many places. I had called *** however they said its over 12 months and out of warr, They will not do anything. It has now been maybe 15 or so months. I called *** sellers of the flooring to CMK they came to look at it said it was a bad install however after many calls to them no answer.Business Response
Date: 09/26/2024
We sincerely apologize for the issues you are experiencing with your flooring. After our initial conversation, we do not have any additional documented calls from our call center regarding further communication with you.
Please contact our warranty phone number at 727-554-4552 at your earliest convenience. We would be happy to discuss the findings from MSI and determine the next steps together.
Thank you for your understanding.Initial Complaint
Date:05/21/2024
Type:Service or Repair IssuesStatus:ResolvedMore info
Complaint statuses
- Resolved:
- The complainant verified the issue was resolved to their satisfaction.
- Unresolved:
- The business responded to the dispute but failed to make a good faith effort to resolve it.
- Answered:
- The business addressed the issues within the complaint, but the consumer either a) did not accept the response, OR b) did not notify BBB as to their satisfaction.
- Unanswered:
- The business failed to respond to the dispute.
- Unpursuable:
- BBB is unable to locate the business.
In August of 2023, we contracted CMK construction to repair a structural header in our ceiling, re- wire electric and remodel bathroom. We were provided an estimate of $25,000 in which we provided a $10,000 deposit that was paid on 8/23/23. We had no communication with CMK until March of 2024. 3/27/24: we had the framers, electrician, and plumbers arrive to our home. The framework and electric work were done incorrectly. 3/29/24: 2nd visit for framework was completed incorrectly again forcing us to have to support our ceiling with a wooden beam and ***** 4/18/24: *******, (CMK Manager) came to location to discuss problems with work. At that time, we questioned the estimate, requesting a break-down of services. ******* stated that they don't provide cost breakdowns and that CMK is in the business of making money. During this meeting, it was discovered that the original framers did not even look at the blueprints for the job. We canceled bathroom remodel and requested new estimate, which dropped to $21, 000. We were also told a more proficient framer would come out to reassess the job. 4/24/24, new framer arrived to reassess repair, questioned the new price quote. Stated that this job was not as expensive as previously estimated. 5/1 we had a separate contractor come to provide an estimate of the framework, which proved to be a significantly lower price. 5/6/24: new framers from CMK showed up to home without notice attempting to come in to begin the 3rd repair. We sent them away due to no relocation preparation or notification that they were coming. 5/21/24: We had a separate electrician come in to provide an estimate for the electric work, which proved to be a significantly lower price. We are requesting a refund of our $10,000 deposit due to price gauging and poor and unsafe quality of work.Business Response
Date: 06/03/2024
When Mr. and *************** reached out to CMK regarding their project, we promptly dispatched a regional manager to address their concerns. We assured them that any issues would be rectified without incurring additional costs. Despite their inquiry about the contract price and request for line-item pricing, we clarified our pricing structure, which encompasses the total scope of work along with a markup for profit.
Throughout our interactions, the conversation remained respectful, and arrangements were made for a structural contractor to evaluate the project and schedule the installation of a new beam. In response to their request to exclude plumbing work from the contract, we provided an appropriate credit. However, a communication mishap occurred when our regional manager inadvertently texted the wrong ***** while attempting to confirm the start date.
Despite our repeated attempts to reschedule, there was a lack of response from the clients. It was later communicated that ************** was frequently out of town for work, leading to delays in scheduling. Subsequently, they began expressing dissatisfaction, citing lower estimates from other sources and demanding a full refund. However, it remained unclear whether these estimates included all necessary components such as materials and engineering services.
It's important to note that we have a contractual agreement and are committed to fulfilling our obligations. Our primary objective is to complete the project, but we require access to the property to do so. We remain open to resolving any outstanding issues and completing the work as agreed upon in our contract.
Customer Answer
Date: 06/04/2024
Complaint: 21740631
We would like to reject CMK constructions offer to come in to complete the proposed work. The reasonings for this rejection include a previous attempt to repair the first installation which was also performed incorrectly, the mandatory Electric work that must be completed in order to finish the support beam was left out in the original contract, causing an additional surcharge to complete the work, thus adding an unknown additional cost towards our final total, and an overall loss of confidence and trust with the quality of work that is performed by CMK construction.
The conversations with *******, the supervisor, although have been cordial, have been unprofessional and deeply concerning. During the initial installation of the support beam, the team was unable to begin the work because the wrong sized material was brought in. The framers had to go to ********** to purchase the correct sized lumber. This project had to be reviewed and planned out by an engineer that specified with drawn out blueprints that a specific beam would need to be used. This specific beam was not the material that was purchased from ********** that day, nor was the material correct the second time they arrived to repair the first mistake. When we initially questioned why the first team had to go to ********** to purchase supplies, *******, the supervisor, Stated, Lumber is lumber. It does not matter where it comes from. My husband, who works in the construction industry, disagreed, and explained to ******* that this support beam could not just be purchased at just any home improvement store. This is when we also discovered that the electric work was not included in our original price that was quoted, and that there will be additional charges that will accrue. We were taken back by this discovery because we spoke to multiple employees from CMK and explained thoroughly that the electric work must be completed at the same time the support beam was installed, due to the re-wiring needed to be ran through the new header. We now began to question the entire price quote at this time. We asked for an itemized listing of the cost of the work, which ******* explained to us that they do not provide that type of billing. When we expressed that we were under the impression that the electric was included with this estimate and that the price seemed too high, ******* stated, You have to understand, we are in the business of making money. After that statement was made, I expressed my dissatisfaction with the lack of communication that CMK has with their clients, providing an example of my profession as a health care provider. I explained to *******, that if I communicated to my patients and medical colleagues in the manner that CMK communicated, people would die. ******* promptly stated that people dont die in construction. These egregious statements, along with waiting for over 6 months with no communication for work to be completed, only to be done incorrectly twice, and the omission of the electrical work in the original contract,demonstrates a complete lack of quality and safety that we are not comfortable with in proceeding with this company. It is also important to mention that multiple electricians have come into our home and provided us with written estimates that state the electric work that has been completed with CMK will not pass inspection. I did mention this concern to *******, to which he simply disagreed.******* did reach out and offer to cancel our contract and provide the materials that had been purchased in leu of providing us with our $10,000 deposit. I told him that I would speak to my husband (since he was out of town at that time), and we would reply. When I attempted to call him to decline this offer, he did not answer the phone. It is also pertinent to mention that we never initially demanded a full refund, we would have been satisfied with a restructure of the estimate. This came from the multiple other quotes from other construction companies that had given us significantly lower price quotes. The request for the refund only happened with my filing with the BBB. We are requesting a refund of our $10,000 deposit minus the $1500 engineering fee along with the permit fees of $425, for a total refund of $8075 to be returned to us and thus releasing CMK Construction of their contractual obligations.
Sincerely,
***************************Business Response
Date: 06/28/2024
To our knowledge, there wasnt a change order for additional electrical work charged to the customer regarding the beam. ******* wasnt involved in the project until after the initial beam work and electrical work were completed. ******* stated that all visits were cordial and professional, and there was no issue until the additional work for the beam was mentioned to the customer.
Regarding ******** statement about the beam, it was taken out of context. It had already been determined that any repair work on the beam would be completed by CMK. The question about the lumber was asked well after the fact, and ******** response indicated that the source of the lumber didnt matter as long as it was constructed properly.
Regarding the electrical work, the customer didnt pay extra for it. They simply asked if we mark up electrical work. When ******* met with the customer, the meeting was light and there were laughs; again, statements were taken out of context.
The customer signed a document stating we were 8-10 weeks from starting. The delay in starting was due to permitting issues as the county had a different floor plan than what was actually at the customers home, and then additional work discovered when the walls were opened, . From the moment ******* got involved, we immediately started trying to expedite the process. Everything was going well until the customer called, removed the plumbing scope, and asked for a credit, which we provided. Then, suddenly, CMK became a problem as they claimed they could complete the project for less, leading to the current situation.Customer Answer
Date: 06/28/2024
Complaint: 21740631
I am rejecting this response because regardless of CMK's opinion that certain remarks were taken out of context during our interaction with *******, we are no longer comfortable with the operations of CMK Construction and no longer want their services. Perception is reality, and in our case, it was pretty obvious to us that there was a lack of professionalism when we voiced our concerns. I should have told ******* right after these egregious comments were made that we were no longer interested in the services and should have dismissed him from our property at that time, however, I was very uncomfortable and I failed to speak up for myself. In addition to providing quality work, (which has already been proven to be lacking as evidenced by the 2 previous incorrect installation attempts) quality customer service should also be an important factor when performing services for a client, which we did not receive. Again, we are requesting a refund of our deposit for $10,000, minus the engineering fee and cost of the permits. We would very much like to settle this dispute cordially and release CMK of any further obligations to our property.
Sincerely,
***************************Business Response
Date: 06/28/2024
We appreciate your recent message regarding your experience with CMK Construction. Your concerns about the professionalism during your interaction with ******* are understood.
******* occupies a senior position at CMK Construction and has a long-standing record of professionalism with our clientele. For nearly two decades, CMK Construction has been successfully completing a multitude of remodeling projects, ensuring client satisfaction.We are committed to resolving this issue amicably, as per your request. Nonetheless, we must point out that the expenses incurred have surpassed your initial deposit. Should you choose to cancel your project, kindly inform us, and we will proceed with the necessary documentation as stipulated in the contract terms.
We thank you for your understanding and cooperation.Customer Answer
Date: 07/03/2024
Complaint: 21740631
Thank you for your prompt response regarding my concerns of the professionalism by your senior staff. It saddens me to see that CMK is more concerned with protecting their staff members rather than addressing their customer's concerns, however, I would like to move forward and proceed with the completion of this project. I do have some general questions regarding this project, since it has been almost a year since we have begun this journey. I would like for a member of CMK, preferably Manny, to please call me so that my questions can be answered and we can plan to move forward.
Sincerely,
***************************Business Response
Date: 07/09/2024
It's great to hear that you are willing to move forward with the completion of the project. I'll make sure your request is communicated to the *** team. ***** or another senior staff member will reach out to you as soon as possible to address your questions and plan the next steps.Customer Answer
Date: 07/25/2024
Better Business Bureau:
I have reviewed the response made by the business in reference to complaint ID ********, and find that this resolution is satisfactory to me.
Sincerely,
***************************Initial Complaint
Date:05/15/2024
Type:Service or Repair IssuesStatus:ResolvedMore info
Complaint statuses
- Resolved:
- The complainant verified the issue was resolved to their satisfaction.
- Unresolved:
- The business responded to the dispute but failed to make a good faith effort to resolve it.
- Answered:
- The business addressed the issues within the complaint, but the consumer either a) did not accept the response, OR b) did not notify BBB as to their satisfaction.
- Unanswered:
- The business failed to respond to the dispute.
- Unpursuable:
- BBB is unable to locate the business.
On August 3rd 2023 My Mother ********************************* and I entered into a contract to have my Father's bathroom remodeled The first problem started when the project manager came out to home and she had no clue what she was doing she ended up we found out later on she ordered incorrect shower pan well a couple months later I believe in October they finally got item correct because they had a new project manager on the job, I tried to cancel in beginning of November because no work was started! Finally November 7th they came out to start. The installers had demolished the shower stall and after that they showed us the new shower It Was not what we ordered! I quickly called ******************* He said we ordered linen but in reality we told him Grey Subway he stated he takes a picture with brochure and time stamps it When I asked him to produce such pictures he said could not find! Well I had no choice but to except what we didn't want do to this was for my handicap Father and couldn't wait months for correct products. Well so many more problems we have dealt with CMK BUT OUR issue is that for the past 2 months My Mother and I have been calling due to a problem with shower pan and Not 1 time has anyone returned our calls. I speak with a wonderful lady named Georgia daily now and she has tried to get Management to contact myself but for some reason they get your money and don't want to deal with customers problems. I would greatly appreciate a call from them I'm not looking for money JUST GOOD CUSTOMER SERVICE!Sincerely *********************************** ************Business Response
Date: 06/03/2024
Thank you for reaching out to us regarding your concerns with the bathroom remodeling project. We apologize for the frustrations you've experienced.
Effective communication and reliable service are paramount, especially for projects like this. We take your feedback seriously and escalated your case to our management team for immediate attention. ******** from our warranty department has contacted you and addressed your issue. If you need to contact her directly in the future, her number is ************
We apologize for any inconvenience, and we are glad your issue is resolved.Customer Answer
Date: 06/03/2024
Better Business Bureau:
I have reviewed the response made by the business in reference to complaint ID ********, and find that this resolution is satisfactory to me.
Sincerely,
***********************************Initial Complaint
Date:01/17/2024
Type:Sales and Advertising IssuesStatus:AnsweredMore info
Complaint statuses
- Resolved:
- The complainant verified the issue was resolved to their satisfaction.
- Unresolved:
- The business responded to the dispute but failed to make a good faith effort to resolve it.
- Answered:
- The business addressed the issues within the complaint, but the consumer either a) did not accept the response, OR b) did not notify BBB as to their satisfaction.
- Unanswered:
- The business failed to respond to the dispute.
- Unpursuable:
- BBB is unable to locate the business.
Their construction crew left nails in our driveway, nails they were specifically using and the construction manager, who has been amazing, took pictures of the screws and the tires and went to his manger to try to get us a discount of some sort since we had to replace the tires after attempting to get them fixed but had to completely replace the tire. We had 2 cars in the drive and both cars ended up with the same specific screws that they were using. The crew admitted that it was their screws! But we got no compensation or discount for the cost of repairing the tires that ultimately had to get replaced.Business Response
Date: 01/31/2024
We have reached out and we are working on a resolution.Initial Complaint
Date:10/27/2023
Type:Service or Repair IssuesStatus:AnsweredMore info
Complaint statuses
- Resolved:
- The complainant verified the issue was resolved to their satisfaction.
- Unresolved:
- The business responded to the dispute but failed to make a good faith effort to resolve it.
- Answered:
- The business addressed the issues within the complaint, but the consumer either a) did not accept the response, OR b) did not notify BBB as to their satisfaction.
- Unanswered:
- The business failed to respond to the dispute.
- Unpursuable:
- BBB is unable to locate the business.
In September 2023, we had initially agreed to use CMK construction to remodel our bathroom. They took a $10000 deposit to move forward. After they took the deposit, they then scheduled a visit with their design person to make selections. They stated multiple times that the job would cost $30000. After meeting with the design person, the total cost was over $44000. They did not inform us of additional costs and if we knew that we would have never followed through. It is now the end of October and we have not received our refund. They provided no work other than meeting with the designer. They keep telling me that there is a 20 percent cancellation fee and it would not be fair to other customers if they gave us a refund. I said I would pay for the time spent that the designer used but they keep quoting a 20 percent fee for no work done. In fact they currently have 34 percent of the fee and have not responded to me. I even agreed to speak to their legal department but still nothing.Business Response
Date: 11/28/2023
Hello we recently became aware of your intention to cancel your contract with us, and I wanted to reach out to address any concerns you may have. Your satisfaction is our top priority, and we genuinely value your business. We understand your concerns about the cancellation fee,but it is clearly stated in the contract, the fee is in place to cover the costs associated with processing the cancellation and any potential losses for the service we have dedicated to your account. We strive to provide a fair and transparent service to all of our customers. If you have any further questions or concerns, we would be happy to discuss them with you. Thank you for your understanding.Customer Answer
Date: 11/29/2023
Complaint: 20790441
I am rejecting this response because the only service provided was talking to the person at the design center. You can't have a cancellation fee when you are not transparent with the financial commitment. You promised us a fee knowing full well that you were going to tack on extra financial expectations after the fact. If you would have been upfront, then we would not have moved forward. We couldn't find out about the extra financial cost until we put a down payment. I can only surmise that you knew what was going to happen after the design center. If you wanted to be upfront and transparent, then the final financial determination would have been completed before asking for a down payment. If you wanted to be fair, then this would have happened first. This is shady business practice. You know it, I know it, and others you read this will know it. I have dealt with numerous construction companies over the years and all were transparent with what I was going to pay. Unfortunately, you did not meet the standard of a reputable company.
Sincerely,
*********************Business Response
Date: 12/20/2023
**************,
CMK Construction's commitment to excellence, as reflected in its accomplishments and industry accolades, is a testament to the dedication and professionalism that defines our organization. Stating that we are not a reputable company simply isn't true. We hold great respect for the high standards and quality of work that CMK Construction consistently upholds. The extensive track record and exceptional reputation of CMK Construction impressive achievements, including the completion of thousands of projects, an A+ rating with the BBB, and recognition with awards from the **************** We value our longstanding relationships and take pride in our work and the positive feedback we receive from hundreds of satisfied clients.
I understand your concerns about the additional items added to your project during your visit to the showroom. We strive to be transparent in our communication and ensure that our clients are fully informed about any changes that *** impact the project's scope or cost. I want to assure you that we would like nothing else but to complete your project. If there are specific items you would like to remove from the project to revert to the original contract, we can certainly discuss those adjustments. Our goal is to ensure your satisfaction and address any concerns you *** have.
Regarding the contractual terms, we acknowledge that contracts are in place to protect both parties. Communication is key, and we are committed to working collaboratively to reach a resolution that meets your expectations and preserves the positive relationship we have built over the years. Please feel free to respond with your thoughts, and we can continue the discussion to find a mutually agreeable solution. Thank you for your understanding, and we look forward to resolving this matter with your satisfaction in mind.Customer Answer
Date: 12/21/2023
Complaint: 20790441
I am rejecting this response because: if you wanted to be transparent, then everything would have been completed up front before any money changed hands. Transparency means that full disclosure of the final price has been presented and then a choice can be made. CMK presented a partial price, expected an up front payment, and then disclosed the final price. That is not transparency. We want nothing to do with your company. We do not trust your business ethics.
Sincerely,
*********************Initial Complaint
Date:09/25/2023
Type:Service or Repair IssuesStatus:AnsweredMore info
Complaint statuses
- Resolved:
- The complainant verified the issue was resolved to their satisfaction.
- Unresolved:
- The business responded to the dispute but failed to make a good faith effort to resolve it.
- Answered:
- The business addressed the issues within the complaint, but the consumer either a) did not accept the response, OR b) did not notify BBB as to their satisfaction.
- Unanswered:
- The business failed to respond to the dispute.
- Unpursuable:
- BBB is unable to locate the business.
I signed the contact with CMK to renovate my master bath on 08-24-2022. They were to start work on October 1,2022. one excuse after the other they started demo on November 9, 2022. as of now September 22, 2023 they are still not completed and they have now refused to come back claiming they are finished. What is left at this point is to buff off the remaining stain from the repair of the new floor (which they ruined through carelessness and poor building practices) however, they refuse to do so, saying they had "***** did hand buff with a rag and vinegar" when a machine buff is what the instructions call for and the floor is covered with a dull brown coating which gets tracked on feet throughout the home. I have texted, emailed and called leaving many messages but no reply except for the text saying the vinegar and rag was buffing and they are not returning to complete the job.ADDITIONALLY, CMK is falsely advertising that they employ and send to the job LICENSED CONTRACTORS, SUPERIOR CRAFTSMANSHIP, COMPUTER RENDERED DESIGNS. THEY ADVERTISE "WE ENSURE THAT OUR PRODUCTS ARE INSTALLED CORRECTLY EVERY TIME - GUARANTEED" When in fact they send unlicensed subs with CMK shirts on. I am also filing with the ***** due to the number of unlicensed and uninsured workers CMK had working on my renovation and all of the ensuing errors and unfixed building mistakes these workers made and which CMK refused to fix and covered up with tile.THEY ADVERTISE IF THE WORKMANSHIP OR ANY INSTALLATION BY OUR COMPANY PROVES FAULTY THEN UPON NOTICE FROM YOU, WE WILL CAUSE SUCH FAULTS TO BE CORRECTED. YET THEY REFUSE TO COMPLETE THE REPAIR TO THE ***** AND GROUT THEY INSTALLED WHICH THEY THEN RUINED BY WETMOPPING PLASTER DUST INTO THE CHOCLATE BROWN ********* is disorganized, unprofessional. dozens of problems for the 10 months they struggled to finish ONE bathroom, lied about "employees" and their licenses, sent workers with no tools or supplies, damaged other rooms in the houseBusiness Response
Date: 10/09/2023
Dear ********************,
Thank you for taking the time to share your concerns on the Better Business Bureau platform. We truly value feedback from our customers, and we regret that your experience with us did not meet your expectations.
We apologize for any inconvenience or frustration you may have experienced during your interaction with our company. We take customer satisfaction seriously, and we are committed to addressing and resolving any issues that arise.
We certainly do not agree with many of the statements you have made. Even though you signed a punch list on June 29th stating the only item remaining were your mirrors which were installed, and also made final payment. You mentioned another issue at a much later time, and CMK sent a technician out. Alternatively, several people from our customer support team reached out to you with no response until recently. We are available to assist you and work towards a resolution.
Once again, we apologize for any inconvenience caused,and we appreciate your feedback. We look forward to the opportunity to resolving this issue with your cooperation.Initial Complaint
Date:03/06/2023
Type:Billing IssuesStatus:AnsweredMore info
Complaint statuses
- Resolved:
- The complainant verified the issue was resolved to their satisfaction.
- Unresolved:
- The business responded to the dispute but failed to make a good faith effort to resolve it.
- Answered:
- The business addressed the issues within the complaint, but the consumer either a) did not accept the response, OR b) did not notify BBB as to their satisfaction.
- Unanswered:
- The business failed to respond to the dispute.
- Unpursuable:
- BBB is unable to locate the business.
On July 1, 2022, a salesperson from CMK, came to our residence to give us an estimate to remodel a shower. She gave us an estimate of $19,385.01 with a July 4th promotion of $1200 for a final price of $18,158.01. She assured us that the discount would be honored through the following 4th of July week to give us time to visit the showroom. On July 5th, my wife talked to *******************************, the salesperson, on the phone. She told her that she could not visit the showroom that day because of a church event , but she could pay the deposit and sign the contract the following day, on July the 6th. As agreed, my wife visited the showroom on July 6th, liked the materials available, signed the contract and paid the deposit. It was not until September, 2022 that we realized that CMK was billing us the whole $19,385 and was not honoring the July the 4th discount. Apparently there was an expiration date of July the 5th, (the day my wife talked to ********************) and we had missed it because it was in fine print. At the time of signing, we thought they would adjust the final price after making the first payment. In summary, we were denied a $1200 discount because we were never told it was going to expire the following day! If ******************** would have informed us about it, we would have found a way to meet the deadline. I talked to a CMK manager, *****, on October 6th, 2022. He was not moved by the fact that we had a verbal agreement with their salesperson and that we were not aware of a specific expiration date. I told him that my wife had talked to Ms. ******** on July the 5th to let her know of our intentions to put a deposit the following day and during that conversation there was no mention of an expiration date. He said it would be "favoritism" to give us the promised discount. I asked to talk to the owner or somebody in upper management but he said he had the last word.We feel like victims of an unfair business practice and believe numbers were misrepresented!Business Response
Date: 03/09/2023
We are sorry that ************ was confused, but on his image 3 it clearly states he received a $1,200 credit for the July 4th promotion and a additional $500 for being a medical professional. The contract he signed and paid the deposit on was issued on July 1st and included the discount. If CMK hadn't honored the discount his contract would have increased by the $1,200. Honestly this should be reviewed by the BBB and removed as a formal complaint since it doesn't have any merit.Customer Answer
Date: 03/09/2023
Complaint: 19541211
I am rejecting this response because:That is completely false and the salesperson would have a difficult time supporting it in a sworn statement. The truth is that the salesperson stated that there could be only one discount, not both. She offered the July 4th discount and not the professional discount. Their statement only demonstrates how ambiguous and misleading their contract. was. So now they are saying that they gave us both discounts. That makes me believe that their pricing was really inflated. The company is basing their response on what they see as proof disregarding completely what the salesperson actually said. My intention was to upload 7 pages including the page where the salesperson wrote the actual numbers. I just noticed that I have a 30 minute deadline to complete this so I am wrapping up and will attempt to upload the missing page. I already faxed it to BBB yesterday. Please look for it. Thank you very much.
Sincerely,
***********************Initial Complaint
Date:07/25/2022
Type:Billing IssuesStatus:AnsweredMore info
Complaint statuses
- Resolved:
- The complainant verified the issue was resolved to their satisfaction.
- Unresolved:
- The business responded to the dispute but failed to make a good faith effort to resolve it.
- Answered:
- The business addressed the issues within the complaint, but the consumer either a) did not accept the response, OR b) did not notify BBB as to their satisfaction.
- Unanswered:
- The business failed to respond to the dispute.
- Unpursuable:
- BBB is unable to locate the business.
We are military veterans who contracted with CMK to remodel 2 bathrooms. We have paid for 3 quarters of the contract with CMK and experienced a major leak with installation of tub and vanities that has now ruined our first floor ceiling and crown molding around door. They did not take ownership of the issue and blamed it on us initially then came back to apologize and correct the issue, but instead they left us with no water for 12 hours and we had to call our own emergency plumber to stop the leak and promised to reimburse us. After reaching out to their regional point of contact and manager we were told of their release of position and have not received a call back or timeline of when or who would be fixing the plumbing and the damages. We now have a leak where the toilet was installed and the first bathroom shower is not draining properly and there are noticeable holes developing in between the tile.Business Response
Date: 08/31/2022
Business Response /* (1000, 9, 2022/08/18) */ In response to the complaint that CMK was not taking responsibility and not willing to fix the damages is just not true. From the evening of the incident and the following two weeks we communicated to the client that we are fully responsible and would make all repairs to their satisfaction. I personally communicated that to the client and took responsibility the evening of the event and then reached out several days later and informed them we were acquiring the drywall material needed to make the repairs . A week after the event that I believe was on August 3rd, I had my project manager go out to the ****** home to inventory the molding that needed to be replaced. After that day, the client has not responded to any request from project manager or me to call us to coordinate scheduling the repairs. Last Friday, August 5th, I had my project manager go by the ****** home and they told him they contacted an attorney and were advised not to speak to us. But CMK would like nothing more than to be given the opportunity to repair all damages to the ******'s satisfaction. The overall project was nearly completed.
CMK Construction, Inc. is BBB Accredited.
This business has committed to upholding the BBB Standards for Trust.
Why choose a BBB Accredited Business?BBB Business Profiles may not be reproduced for sales or promotional purposes.
BBB Business Profiles are provided solely to assist you in exercising your own best judgment. BBB asks third parties who publish complaints, reviews and/or responses on this website to affirm that the information provided is accurate. However, BBB does not verify the accuracy of information provided by third parties, and does not guarantee the accuracy of any information in Business Profiles.
When considering complaint information, please take into account the company's size and volume of transactions, and understand that the nature of complaints and a firm's responses to them are often more important than the number of complaints.
BBB Business Profiles generally cover a three-year reporting period. BBB Business Profiles are subject to change at any time. If you choose to do business with this business, please let the business know that you contacted BBB for a BBB Business Profile.
As a matter of policy, BBB does not endorse any product, service or business. Businesses are under no obligation to seek BBB accreditation, and some businesses are not accredited because they have not sought BBB accreditation. BBB charges a fee for BBB Accreditation. This fee supports BBB's efforts to fulfill its mission of advancing marketplace trust.